Build itemised estimates from labour, material and equipment lines, add overhead, profit and GST, and track each estimate to acceptance.
Sign in with your Edesy account, then click Use template in the preview to copy the base, with its sample rows, into your workspace.
Category
Tables
Estimates, Line items
Fields
23
Views
grid, kanban, dashboard
The 2 linked tables in this template, with their real columns, field types and sample rows. Copy the template to edit them in Edesy Tables.
16 fields · 3 sample rows
| EstimateText | ClientText | EmailEmail | PhonePhone | Job addressAddress | ScopeLong text | Estimate dateDate | Valid untilFormula | StatusSingle select | Line itemsLink to another table | LinesCount | Direct costRollup | Overhead & profitPercent | GSTPercent | Pre-tax totalFormula | Grand totalFormula |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| EST-1021 Kitchen remodel | Ankita Sharma | [email protected] | +91 98110 12345 | B-402, Palm Grove, Sector 52, Gurugram, Haryana, India | Strip out, new modular kitchen, wall tiling, electrical points | 13 Nov 2026 | 13 Dec 2026 | Sent | Demolition & debris removal, Modular kitchen units, Wall tiles incl. laying, Electrical points | 4 | ₹3,57,800 | 15% | 18% | ₹4,11,470 | ₹4,85,535 |
| EST-1022 Terrace waterproofing | Ridgeview CHS | [email protected] | Remove old screed, APP membrane, protective screed | 17 Nov 2026 | 17 Dec 2026 | Draft | APP membrane waterproofing | 1 | ₹2,28,000 | 12% | 18% | ₹2,55,360 | ₹3,01,325 | ||
| EST-1018 Office partitions | Nexa Fintech | [email protected] | Gypsum partitions and glass cabins for 40-seat office | 25 Oct 2026 | 24 Nov 2026 | Accepted | Gypsum partition, Glass cabin (toughened 12 mm) | 2 | ₹6,24,000 | 18% | 18% | ₹7,36,320 | ₹8,68,858 |
7 fields · 7 sample rows
| ItemText | EstimateLink to another table | CategorySingle select | QuantityNumber | UnitSingle select | Unit priceCurrency | Line totalFormula |
|---|---|---|---|---|---|---|
| Demolition & debris removal | EST-1021 Kitchen remodel | Labour | 1.00 | LS | ₹18,000 | ₹18,000 |
| Modular kitchen units | EST-1021 Kitchen remodel | Subcontract | 14.00 | rmt | ₹22,000 | ₹3,08,000 |
| Wall tiles incl. laying | EST-1021 Kitchen remodel | Material | 120.00 | sqft | ₹165 | ₹19,800 |
| Electrical points | EST-1021 Kitchen remodel | Labour | 10.00 | nos | ₹1,200 | ₹12,000 |
| APP membrane waterproofing | EST-1022 Terrace waterproofing | Subcontract | 2,400.00 | sqft | ₹95 | ₹2,28,000 |
| Gypsum partition | EST-1018 Office partitions | Subcontract | 1,800.00 | sqft | ₹120 | ₹2,16,000 |
| Glass cabin (toughened 12 mm) | EST-1018 Office partitions | Material | 6.00 | nos | ₹68,000 | ₹4,08,000 |
Yes. Copy the template, then import a .csv, .tsv or .xlsx file into any of its tables and map the columns. Delete the sample rows first if you do not need them.
Yes. An automation runs when a record is created, updated or matches a filter, when a form is submitted, on a schedule or when a date arrives, and can update or create records, call a webhook or post to a connected Slack channel.
Line up subcontractor bids for each work package side by side — price with tax, duration, warranty and score — and award the best one.
2 tables · 24 fieldsBid Tabulation TemplateA classic bid tab: each BOQ line priced by three bidders against the engineer’s estimate, with extended totals and the lowest bidder per line.
1 table · 15 fieldsBill of Materials TemplateEvery component needed for a build with quantity, unit cost, extended cost and order status, tied to suppliers and their lead times.
2 tables · 23 fieldsClient List TemplateA tidy list of every client for any service business — contact details, visits, spend and how long since you last saw them.
1 table · 16 fieldsConstruction Budget TemplateCost-code budget for a build: original budget plus change orders, committed and actual cost from invoices, and overrun warnings per line.
2 tables · 21 fieldsConstruction ChecklistPhase-by-phase site checklist from pre-construction to handover, with owners, due dates, required inspections and photo proof.
1 table · 10 fields