Log every defect found on a commercial site by location and trade, assign it to the responsible sub and close it out with before/after photos.
Sign in with your Edesy account, then click Use template in the preview to copy the base, with its sample rows, into your workspace.
Category
Tables
Punch items
Fields
13
Views
grid, kanban, cards, calendar, form
The table in this template, with its real columns, field types and sample rows. Copy the template to edit it in Edesy Tables.
13 fields · 6 sample rows
| IssueText | LocationText | TradeSingle select | Responsible subText | PrioritySingle select | StatusSingle select | Identified onDate | Due dateDate | Days openFormula | Before photoAttachment | After photoAttachment | Verified byText | NotesLong text |
|---|---|---|---|---|---|---|---|---|---|---|---|---|
| Socket faceplate cracked | L3 — Unit 304, living | Electrical | Volt Electricals | Normal | Open | 13 Nov 2026 | 23 Nov 2026 | 6 | ||||
| Leak under kitchen sink | L2 — Unit 201 | Plumbing | AquaFix Plumbing | Critical | In progress | 15 Nov 2026 | 19 Nov 2026 | 4 | ||||
| Paint touch-up on corridor wall | L4 corridor, grid C-5 | Drywall & painting | ColourPro Painters | Low | Ready for review | 9 Nov 2026 | 21 Nov 2026 | 10 | ||||
| Hollow-sounding floor tiles | Lobby, near lift 2 | Flooring & tiling | Stone & Tile Co. | High | Open | 16 Nov 2026 | 26 Nov 2026 | 3 | ||||
| Window gasket missing | L5 — Unit 502, bedroom | Glazing | ClearView Glazing | Normal | Closed | 30 Oct 2026 | 9 Nov 2026 | R. Menon (QA) | ||||
| AC drain pipe not connected | L3 — Unit 302 | HVAC | CoolAir Systems | High | Open | 18 Nov 2026 | 22 Nov 2026 | 1 |
Form view “Report a punch item” asks for: Issue, Location, Trade, Priority, Before photo, Notes.
Yes. Copy the template, then import a .csv, .tsv or .xlsx file into any of its tables and map the columns. Delete the sample rows first if you do not need them.
Yes. An automation runs when a record is created, updated or matches a filter, when a form is submitted, on a schedule or when a date arrives, and can update or create records, call a webhook or post to a connected Slack channel.
Line up subcontractor bids for each work package side by side — price with tax, duration, warranty and score — and award the best one.
2 tables · 24 fieldsBid Tabulation TemplateA classic bid tab: each BOQ line priced by three bidders against the engineer’s estimate, with extended totals and the lowest bidder per line.
1 table · 15 fieldsBill of Materials TemplateEvery component needed for a build with quantity, unit cost, extended cost and order status, tied to suppliers and their lead times.
2 tables · 23 fieldsClient List TemplateA tidy list of every client for any service business — contact details, visits, spend and how long since you last saw them.
1 table · 16 fieldsConstruction Budget TemplateCost-code budget for a build: original budget plus change orders, committed and actual cost from invoices, and overrun warnings per line.
2 tables · 21 fieldsConstruction ChecklistPhase-by-phase site checklist from pre-construction to handover, with owners, due dates, required inspections and photo proof.
1 table · 10 fields