Register every drawing sheet by number, discipline and revision, track its issue status and who it went to, and keep the file attached.
Sign in with your Edesy account, then click Use template in the preview to copy the base, with its sample rows, into your workspace.
Category
Tables
Drawings
Fields
14
Views
grid, kanban, calendar, cards
The table in this template, with its real columns, field types and sample rows. Copy the template to edit it in Edesy Tables.
14 fields · 6 sample rows
| Drawing no.Text | TitleText | DisciplineSingle select | RevisionText | Revision dateDate | StatusSingle select | Sheet sizeSingle select | ScaleText | Drawn byText | Checked byText | Issued toMultiple select | Days since revisionFormula | FileAttachment | Revision notesLong text |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A-101 | Ground floor plan | Architectural | C | 7 Nov 2026 | For construction | A1 | 1:100 | Pooja M. | Ar. S. Kapoor | Client, Contractor | 12 | Kitchen layout revised; added utility door | |
| A-201 | Elevations — north & south | Architectural | B | 30 Oct 2026 | For approval | A1 | 1:100 | Pooja M. | Ar. S. Kapoor | Client, Authority | 20 | ||
| S-001 | Foundation layout & details | Structural | 2 | 15 Oct 2026 | For construction | A0 | 1:50 | Kevin D. | Er. R. Iyer | Contractor | 35 | ||
| E-101 | Ground floor lighting & power | Electrical | A | 16 Nov 2026 | For review | A1 | 1:100 | Faisal K. | MEP consultant | 3 | |||
| P-101 | Water supply & drainage layout | Plumbing | A | 11 Nov 2026 | Preliminary | A1 | 1:100 | Faisal K. | 8 | ||||
| A-101 | Ground floor plan | Architectural | B | 2 Oct 2026 | Superseded | A1 | 1:100 | Pooja M. | Ar. S. Kapoor | Client | 48 |
Yes. Copy the template, then import a .csv, .tsv or .xlsx file into any of its tables and map the columns. Delete the sample rows first if you do not need them.
Yes. An automation runs when a record is created, updated or matches a filter, when a form is submitted, on a schedule or when a date arrives, and can update or create records, call a webhook or post to a connected Slack channel.
Line up subcontractor bids for each work package side by side — price with tax, duration, warranty and score — and award the best one.
2 tables · 24 fieldsBid Tabulation TemplateA classic bid tab: each BOQ line priced by three bidders against the engineer’s estimate, with extended totals and the lowest bidder per line.
1 table · 15 fieldsBill of Materials TemplateEvery component needed for a build with quantity, unit cost, extended cost and order status, tied to suppliers and their lead times.
2 tables · 23 fieldsClient List TemplateA tidy list of every client for any service business — contact details, visits, spend and how long since you last saw them.
1 table · 16 fieldsConstruction Budget TemplateCost-code budget for a build: original budget plus change orders, committed and actual cost from invoices, and overrun warnings per line.
2 tables · 21 fieldsConstruction ChecklistPhase-by-phase site checklist from pre-construction to handover, with owners, due dates, required inspections and photo proof.
1 table · 10 fields