Project Closeout Checklist

Everything needed to close a project — documents, final inspections, warranties, training and retention release — with owners and pass/fail results.

Sign in with your Edesy account, then click Use template in the preview to copy the base, with its sample rows, into your workspace.

Category

Construction

Tables

Closeout items

Fields

12

Views

grid, kanban, calendar, dashboard

Tables, columns and sample rows

The table in this template, with its real columns, field types and sample rows. Copy the template to edit it in Edesy Tables.

Closeout items

12 fields · 8 sample rows

  • Checklist (Grid)
  • By result (Kanban)
  • Calendar (Calendar)
  • Closeout progress (Dashboard)
ItemTextCategorySingle selectArea / systemTextResponsible partySingle selectDue dateDateResultSingle selectCompletedCheckboxCompleted onDateAmountCurrencyOverdueFormulaDocumentAttachmentNotesText
As-built drawings (all disciplines)DocumentationAllArchitect26 Nov 2026Pending
O&M manuals — HVAC & liftsDocumentationHVAC, liftsSubcontractor17 Nov 2026PendingOverdue
Fire NOC final inspectionInspectionsFire systemsMain contractor13 Nov 2026PassYes13 Nov 2026
Lift load testInspectionsLifts 1–2Subcontractor15 Nov 2026FailOverdueLift 2 levelling out of tolerance; retest booked
All punch items closedPunch listAll floorsMain contractor29 Nov 2026Pending
Waterproofing warranty (10 yr)WarrantiesTerrace & podiumSubcontractor24 Nov 2026Pending
BMS training for facility teamTrainingBMSMEP consultant1 Dec 2026Pending
Release of 5% retentionFinancialContractOwner19 Dec 2026Pending₹27,50,000
Field details
Item · Text
Category · Single select
Documentation, Inspections, Punch list, Warranties, Training, Financial, Handover
Area / system · Text
Responsible party · Single select
Main contractor, Architect, Owner, Subcontractor, MEP consultant
Due date · Date
Result · Single select
Pending, Pass, Fail, N/A
Completed · Checkbox
Completed on · Date
Amount · Currency
INR
Overdue · Formula
IF(AND(NOT({Completed}), {Due date}, DATETIME_DIFF(TODAY(), {Due date}, 'days') > 0), 'Overdue', '')
Document · Attachment
Notes · Text

Project Closeout Checklist: questions

Yes. Copy the template, then import a .csv, .tsv or .xlsx file into any of its tables and map the columns. Delete the sample rows first if you do not need them.

Yes. An automation runs when a record is created, updated or matches a filter, when a form is submitted, on a schedule or when a date arrives, and can update or create records, call a webhook or post to a connected Slack channel.