Run handover walkthroughs room by room: each walk collects snags, assigns them for fixing and shows how many are closed before keys are handed over.
Sign in with your Edesy account, then click Use template in the preview to copy the base, with its sample rows, into your workspace.
Category
Tables
Walkthroughs, Snags
Fields
21
Views
grid, calendar, kanban, form
The 2 linked tables in this template, with their real columns, field types and sample rows. Copy the template to edit them in Edesy Tables.
10 fields · 3 sample rows
| WalkthroughText | DateDate | Unit / areaText | InspectorText | TypeSingle select | SnagsLink to another table | Snags foundCount | Snags closedRollup | Closed %Formula | Ready to hand overFormula |
|---|---|---|---|---|---|---|---|---|---|
| Flat 1203 — client walk | 14 Nov 2026 | Tower B, Flat 1203 | Ritesh (site engineer) | Client walk | Chipped tile near shower, Bedroom door rubs on frame, No hot water in kitchen tap | 3 | 2 | 67% | Not yet |
| Flat 1204 — pre-handover | 17 Nov 2026 | Tower B, Flat 1204 | Ayesha (QA) | Pre-handover | Paint patches on living wall, Balcony light not working | 2 | 0 | 0% | Not yet |
| Clubhouse — internal QA | 19 Nov 2026 | Clubhouse | Ayesha (QA) | Internal QA | Cement stains on lobby floor | 1 | 0 | 0% | Not yet |
11 fields · 6 sample rows
| SnagText | WalkthroughLink to another table | RoomSingle select | CategorySingle select | SeveritySingle select | Assigned toText | StatusSingle select | Fix byDate | Closed flagFormula | PhotoAttachment | NotesText |
|---|---|---|---|---|---|---|---|---|---|---|
| Chipped tile near shower | Flat 1203 — client walk | Bathroom | Tiles | Minor | Stone & Tile Co. | Fixed | 19 Nov 2026 | 0 | ||
| Bedroom door rubs on frame | Flat 1203 — client walk | Master bedroom | Doors & windows | Minor | WoodCraft Interiors | Verified | 18 Nov 2026 | 1 | ||
| No hot water in kitchen tap | Flat 1203 — client walk | Kitchen | Plumbing | Major | AquaFix Plumbing | Verified | 16 Nov 2026 | 1 | ||
| Paint patches on living wall | Flat 1204 — pre-handover | Living | Paint | Cosmetic | ColourPro Painters | Open | 22 Nov 2026 | 0 | ||
| Balcony light not working | Flat 1204 — pre-handover | Balcony | Electrical | Minor | Volt Electricals | Open | 21 Nov 2026 | 0 | ||
| Cement stains on lobby floor | Clubhouse — internal QA | Common area | Cleaning | Cosmetic | Housekeeping | Open | 20 Nov 2026 | 0 |
Form view “Log a snag” asks for: Snag, Walkthrough, Room, Category, Severity, Photo, Notes.
Yes. Copy the template, then import a .csv, .tsv or .xlsx file into any of its tables and map the columns. Delete the sample rows first if you do not need them.
Yes. An automation runs when a record is created, updated or matches a filter, when a form is submitted, on a schedule or when a date arrives, and can update or create records, call a webhook or post to a connected Slack channel.
Line up subcontractor bids for each work package side by side — price with tax, duration, warranty and score — and award the best one.
2 tables · 24 fieldsBid Tabulation TemplateA classic bid tab: each BOQ line priced by three bidders against the engineer’s estimate, with extended totals and the lowest bidder per line.
1 table · 15 fieldsBill of Materials TemplateEvery component needed for a build with quantity, unit cost, extended cost and order status, tied to suppliers and their lead times.
2 tables · 23 fieldsClient List TemplateA tidy list of every client for any service business — contact details, visits, spend and how long since you last saw them.
1 table · 16 fieldsConstruction Budget TemplateCost-code budget for a build: original budget plus change orders, committed and actual cost from invoices, and overrun warnings per line.
2 tables · 21 fieldsConstruction ChecklistPhase-by-phase site checklist from pre-construction to handover, with owners, due dates, required inspections and photo proof.
1 table · 10 fields