Student Progress Tracking Sheet

Measure each student against baseline and target on specific skills, see growth and who is on track, and plan next steps.

Sign in with your Edesy account, then click Use template in the preview to copy the base, with its sample rows, into your workspace.

Category

Education

Tables

Students, Progress checks

Fields

20

Views

grid, kanban, calendar, dashboard

Tables, columns and sample rows

The 2 linked tables in this template, with their real columns, field types and sample rows. Copy the template to edit them in Edesy Tables.

Students

8 fields · 4 sample rows

  • Caseload (Grid)
StudentTextGradeSingle selectSupport planSingle selectCheckpointsLink to another tableGoals trackedCountGoals on trackRollupAverage growthRollupLast checkedRollup
Rudra NairGrade 4Reading interventionOral reading fluency (words/min), Oral reading fluency (words/min)2013.5017 Nov 2026
Ava ThompsonGrade 4NoneMultiplication facts (out of 50)111815 Nov 2026
Zain AbbasGrade 4IEPParagraph with topic sentence (rubric /12), Turn-taking in group work (out of 10)20314 Nov 2026
Mei LinGrade 4English learnerSight words recognised (out of 100)114318 Nov 2026
Field details
Student · Text
Grade · Single select
Grade 3, Grade 4, Grade 5
Support plan · Single select
None, IEP, Reading intervention, Gifted, English learner
Checkpoints · Link to another table
Links to Progress checks
Goals tracked · Count
Goals on track · Rollup
sum of On track via Checkpoints
Average growth · Rollup
avg of Growth via Checkpoints
Last checked · Rollup
latest of Date via Checkpoints

Progress checks

12 fields · 6 sample rows

  • Checks (Grid)
  • By level (Kanban)
  • Calendar (Calendar)
  • Progress (Dashboard)
Skill / standardTextStudentLink to another tableSubjectSingle selectDateDateBaselineNumberCurrentNumberTargetNumberGrowthFormulaProgress to targetFormulaOn trackFormulaLevelSingle selectNext stepsLong text
Oral reading fluency (words/min)Rudra NairReading17 Nov 20266281951958%0DevelopingDaily partner reading, 10 min
Multiplication facts (out of 50)Ava ThompsonMaths15 Nov 202630484518120%1Advanced
Paragraph with topic sentence (rubric /12)Zain AbbasWriting14 Nov 20264710350%0DevelopingGraphic organiser before drafting
Turn-taking in group work (out of 10)Zain AbbasSocial skills14 Nov 2026368360%0Developing
Sight words recognised (out of 100)Mei LinReading18 Nov 202645888543108%1Proficient
Oral reading fluency (words/min)Rudra NairReading3 Nov 2026627095824%0Beginning
Field details
Skill / standard · Text
Student · Link to another table
Links to Students
Subject · Single select
Reading, Writing, Maths, Social skills
Date · Date
Baseline · Number
Current · Number
Target · Number
Growth · Formula
IF(AND({Current}, {Baseline}), {Current} - {Baseline}, BLANK())
Progress to target · Formula
IF({Target} - {Baseline} > 0, ({Current} - {Baseline}) / ({Target} - {Baseline}), BLANK())
On track · Formula
IF(AND({Target}, {Current} >= {Target}), 1, 0)
Level · Single select
Beginning, Developing, Proficient, Advanced
Next steps · Long text

Student Progress Tracking Sheet: questions

Yes. Copy the template, then import a .csv, .tsv or .xlsx file into any of its tables and map the columns. Delete the sample rows first if you do not need them.

Yes. An automation runs when a record is created, updated or matches a filter, when a form is submitted, on a schedule or when a date arrives, and can update or create records, call a webhook or post to a connected Slack channel.

Related templates