Schedule production orders on the shop floor: materials check, machine slot, run, QC and dispatch.
Sign in with your Edesy account, then click Use template in the preview to create the board, with its sample cards, in your workspace.
Columns
Orders → Materials ready → In production → Quality check → Dispatched
Sample cards
8
Custom fields
Quantity, Customer
Request form
Creates cards in Orders
The 5 columns of this board with its 8 sample cards, labels and fields, as they open in Edesy Boards. Copy the template to move cards and edit it.
Labels
Line A, Line B, Rush order, QC hold, Maintenance
Custom fields
Quantity (Number, on card), Customer (Text, on card)
Request form: Request an item · Manufacturing Schedule
Tell us what you need; it lands on the “Orders” column of this board. Asks for Title, Description, Quantity, Due date; each submission becomes a card in Orders.
Yes, through the board request form. Share its public link; each submission becomes a card in the chosen column, with the answers in the card fields. Viewers of a shared read-only board link can see the board without an account.
Yes. Board automations run when a card is created, moved, assigned, labelled, completed, due soon or overdue, when a form is submitted or on a schedule, and can move, assign, label or archive the card, add a checklist or comment, create another card, call a webhook or post to Slack.
A kaizen board: anyone raises an improvement idea, and the team runs it through Plan-Do-Check-Act.
6 columns · 6 sample cardsFabrication Process TemplateFollow each fabrication job through drawings, material prep, cutting, welding, finishing and QC.
6 columns · 7 sample cardsHardware Manufacturing Supply Chain Tracker TemplateTrack components for a hardware build from sourcing and POs through shipping, receiving and line readiness.
6 columns · 6 sample cardsKaizen Board TemplateContinuous-improvement board: anyone posts a problem, the team proposes small fixes, trials them and standardises what works.
5 columns · 7 sample cardsVisual Management Board TemplateA lean shop-floor board: problems by safety, quality, delivery and cost, with countermeasures tracked to verified.
4 columns · 8 sample cardsWeekly Production Schedule TemplateSchedule a week of production runs by day, with line, quantity and material readiness for each job.
7 columns · 6 sample cards