Schedule customer orders onto production lines, check materials, run quality checks and hand finished batches to dispatch.
Sign in with your Edesy account, then click Use template in the preview to create the board, with its sample cards, in your workspace.
Ideal for
Columns
Orders → Scheduled → In production → Quality check → Shipped
Sample cards
7
Custom fields
Line, Units
Request form
Creates cards in Orders
The 5 columns of this board with its 7 sample cards, labels and fields, as they open in Edesy Boards. Copy the template to move cards and edit it.
Labels
Rush, Material shortage, Rework, Export, Changeover
Custom fields
Line (Single select, on card), Units (Number, on card)
Request form: Submit a request · Production Scheduling
Tell us what you need; it lands on the “Orders” column of this board. Asks for Title, Description, Priority, Due date, Attachments; each submission becomes a card in Orders.
Yes, through the board request form. Share its public link; each submission becomes a card in the chosen column, with the answers in the card fields. Viewers of a shared read-only board link can see the board without an account.
Yes. Board automations run when a card is created, moved, assigned, labelled, completed, due soon or overdue, when a form is submitted or on a schedule, and can move, assign, label or archive the card, add a checklist or comment, create another card, call a webhook or post to Slack.
A kaizen board: anyone raises an improvement idea, and the team runs it through Plan-Do-Check-Act.
6 columns · 6 sample cardsDmaic TemplateRun a Six Sigma DMAIC project: define, measure, analyse, improve and control a process problem.
6 columns · 7 sample cardsFabrication Process TemplateFollow each fabrication job through drawings, material prep, cutting, welding, finishing and QC.
6 columns · 7 sample cardsHardware Manufacturing Supply Chain Tracker TemplateTrack components for a hardware build from sourcing and POs through shipping, receiving and line readiness.
6 columns · 6 sample cardsKaizen Board TemplateContinuous-improvement board: anyone posts a problem, the team proposes small fixes, trials them and standardises what works.
5 columns · 7 sample cardsManufacturing Production Schedule TemplateA day-by-day schedule for the shop floor: which line runs which batch, planned changeovers and maintenance windows.
6 columns · 7 sample cards