Contractor Estimate Template

Build itemised construction and renovation quotes with materials, labour, equipment, subcontractors, permits and contingency.

Sign in with your Edesy account, then click Use template in the preview to copy the base, with its sample rows, into your workspace.

Category

Estimates

Tables

Estimates, Line items

Fields

35

Views

grid, kanban, calendar, form, dashboard

Tables, columns and sample rows

The 2 linked tables in this template, with their real columns, field types and sample rows. Copy the template to edit them in Edesy Tables.

Estimates

27 fields · 3 sample rows

  • All estimates (Grid)
  • Pipeline (Kanban)
  • Calendar (Calendar)
  • Request an estimate (Form)
  • Dashboard (Dashboard)
EstimateTextClientTextEmailEmailPhonePhoneJob addressAddressProject typeSingle selectProposed startDateDuration (weeks)NumberPermit requiredCheckboxSite visit doneCheckboxStatusSingle selectEstimate dateDateValid untilFormulaDays to expiryFormulaLine itemsLink to another tableItemsCountSubtotalRollupDiscountCurrencyTax ratePercentTaxFormulaTotalFormulaDeposit %PercentDeposit dueFormulaPrepared byTextPhotosAttachmentNotes & termsLong textClient signatureSignature
CON-501 · Kapoor kitchen remodelVikram Kapoor[email protected]+91 98100 55667C-14, Vasant Vihar, New Delhi, IndiaRenovation3 Dec 20265YesSent17 Nov 202617 Dec 202628Demolition of old cabinets & tiles, Vitrified floor tiles 2×2 ft, Modular cabinets (BWP ply), Electrical & plumbing rework, Contingency (5%)5₹3,85,60018.00%₹69,408₹4,55,00830%₹1,36,502Harpreet Singh
CON-502 · Thomas rooftop roomAnil Thomas[email protected]+91 94470 22334TC 12/450, Kowdiar, Thiruvananthapuram, IndiaExtension19 Dec 202610YesYesAccepted7 Nov 20267 Dec 2026RCC slab & columns, Cement (OPC 53), Mason & helper crew, Building permit & structural certificate4₹2,88,80018.00%₹51,984₹3,40,78440%₹1,36,314Harpreet Singh
CON-503 · Café Brew fit-outBrew & Co. Cafés[email protected]+91 80 4999 112212th Main, Indiranagar, Bengaluru, IndiaInterior fit-out10 Dec 20266Draft19 Nov 202619 Dec 2026Scaffolding hire, Gypsum false ceiling2₹1,19,50018.00%₹21,510₹1,41,010
Field details
Estimate · Text
Client · Text
Email · Email
Phone · Phone
Job address · Address
Project type · Single select
Renovation, Extension, New build, Interior fit-out, Repair
Proposed start · Date
Duration (weeks) · Number
Permit required · Checkbox
Site visit done · Checkbox
Status · Single select
Requested, Draft, Sent, Accepted, Declined, Expired
Estimate date · Date
Valid until · Formula
IF({Estimate date}, DATEADD({Estimate date}, 30, 'days'), BLANK())
Days to expiry · Formula
IF(AND({Estimate date}, {Status} = 'Sent'), DATETIME_DIFF({Valid until}, TODAY(), 'days'), BLANK())
Line items · Link to another table
Links to Line items
Items · Count
Subtotal · Rollup
sum of Line total via Line items
Discount · Currency
INR
Tax rate · Percent
Tax · Formula
ROUND(({Subtotal} - {Discount}) * {Tax rate}, 2)
Total · Formula
{Subtotal} - {Discount} + {Tax}
Deposit % · Percent
Deposit due · Formula
IF({Deposit %}, ROUND({Total} * {Deposit %}, 2), BLANK())
Prepared by · Text
Photos · Attachment
Notes & terms · Long text
Client signature · Signature

Form view “Request a project estimate” asks for: Client, Email, Phone, Job address, Project type, Proposed start, Photos, Notes & terms.

Line items

8 fields · 8 sample rows

  • By estimate (Grid)
  • By category (Grid)
ItemTextEstimateLink to another tableCategorySingle selectQuantityNumberUnitSingle selectUnit priceCurrencyLine totalFormulaDetailsText
Demolition of old cabinets & tilesCON-501 · Kapoor kitchen remodelLabour3.00day₹6,500₹19,500
Vitrified floor tiles 2×2 ftCON-501 · Kapoor kitchen remodelMaterials180.00sq ft₹95₹17,100
Modular cabinets (BWP ply)CON-501 · Kapoor kitchen remodelSubcontractor1.00lump sum₹2,85,000₹2,85,000
Electrical & plumbing reworkCON-501 · Kapoor kitchen remodelSubcontractor1.00lump sum₹42,000₹42,000
Contingency (5%)CON-501 · Kapoor kitchen remodelContingency1.00lump sum₹22,000₹22,000
RCC slab & columnsCON-502 · Thomas rooftop roomMaterials14.00cu m₹7,800₹1,09,200
Cement (OPC 53)CON-502 · Thomas rooftop roomMaterials160.00bag₹410₹65,600
Mason & helper crewCON-502 · Thomas rooftop roomLabour40.00day₹2,400₹96,000
Field details
Item · Text
Estimate · Link to another table
Links to Estimates
Category · Single select
Materials, Labour, Equipment hire, Subcontractor, Permits & fees, Contingency
Quantity · Number
Unit · Single select
each, sq ft, cu m, bag, day, lump sum
Unit price · Currency
INR
Line total · Formula
ROUND({Quantity} * {Unit price}, 2)
Details · Text

Contractor Estimate Template: questions

Yes. Copy the template, then import a .csv, .tsv or .xlsx file into any of its tables and map the columns. Delete the sample rows first if you do not need them.

Yes. An automation runs when a record is created, updated or matches a filter, when a form is submitted, on a schedule or when a date arrives, and can update or create records, call a webhook or post to a connected Slack channel.

Related templates